WEBB CITY R-VII SCHOOL DISTRICT | CARDINAL STADIUM IMPROVEMENTS
![IMG_1435.jpg](https://images.squarespace-cdn.com/content/v1/616dcd1f2b034d749d32d816/1641419365365-A954EWTR0NIB39T868JV/IMG_1435.jpg)
![IMG_1421.jpg](https://images.squarespace-cdn.com/content/v1/616dcd1f2b034d749d32d816/1639758119359-RUHXB25KEMXVE44AFC5S/IMG_1421.jpg)
![IMG_1433.jpg](https://images.squarespace-cdn.com/content/v1/616dcd1f2b034d749d32d816/1639758119527-URAQA5S79NIMO31BDZIZ/IMG_1433.jpg)
![IMG_1456.jpg](https://images.squarespace-cdn.com/content/v1/616dcd1f2b034d749d32d816/1639758120199-DVERLDZ6QSLO3OKKFSU4/IMG_1456.jpg)
Location: Webb City R-VII sCHOOL dISTRICT
cost: $641,000(Replacement of base rock, drainage, and synthetic turf and installation of a shock pad)
Together, VSR Design and incite Design Studio renovated the existing Cardinal Stadium at Webb City R-VII High School. iDS was retained for this renovation after the successful completion of two FEMA Safe Room gymnasiums within the district.
The new stadium seats over 5,000 fans; 4,000 Webb City fans and over 1,000 visitors on the east side of the stadium. Visiting fans are accommodated with their own restrooms and full concessions area.
Improvements include all-weather synthetic turf, which includes replacement of base rock, drainage, and synthetic turf. The new turf will also include the installation of a shock pad. A new state of the art video board, measuring 32’x20’ stands atop bleachers on the south end of the field. Live video is recorded via multiple cameras on the sidelines and in the press box. locker rooms were installed as part of the High School FEMA Dome project. It is spacious enough to allow for coach offices, conference room and film study room.